Solar Plant CUF Calculator

25-YEAR · DC & AC SIDE · DEGRADATION ADJUSTED

Enter plant capacities and Year-1 base generation per MWp (DC). CUF is computed for every year — use the slider or click any row to inspect a specific year.

Plant Inputs

CUFDC = Gen ÷ (MWp × 1000 × hrs)
CUFAC = Gen ÷ (MWAC × 1000 × hrs)

PPA Bid — Fixed CUF (25 yr)

Max Safe Bid — no penalty in any year

Selected Year

Year
Generation
MU (lakh kWh: )
CUF — DC Side
on MWp installed
CUF — AC Side
on MW AC capacity

25-Year Schedule

YrDegr. FactorGen (MU)CUF DC %CUF AC %Unpaid MUShort MU